Collection: Products

  • Production Line

    Using the lean production management model, hundreds of spare parts are assembled. Use assembly lines to reduce product production costs.

  • Circuit Detection

    After each chiller is produced, circuit testing is performed first. Circuit detection includes: rated power, wide voltage stability, peak power, voltage fluctuation stability, switch electrical status, short circuit protection, etc.

  • Practical Testing

    The second step is to carry out 200L water: cooling and heating limit temperature detection, cooling and heating capacity detection per unit time, water flow detection, pressure leakage aging detection, disinfection function detection, continuous working time detection, etc.